Consulting
Electrical Appliances
Electrical Appliances
Electrical Appliances
Work Process
-
Preliminary review
of documents and
other check-lists
before import
STEP1
-
Advanced
Clearance
for sample
STEP2
-
Request
for a test to
a testing
institute
STEP3
-
Attach
Korean label
when passed
STEP4
-
Application for safety certification confirmation or conformity assessment confirmation
STEP5
-
Import
Clearance
STEP6
- Required Documents and Checklist
-
- Shipping documents (BL, INVOICE, PL)
- Information on manufacturing factory and manufacturer
- Part list
- A copy of business license
- Park CB report (CB certi + test report / issued within 3 years)
- Electrical circuit diagram (Schematic diagram): complete circuit details including power supply
- Product manual: block diagram and description, user’s guide in KOREAN
-
Insulation material specification:
enclosure, internal plastic, windings, PCB, Insulation Tape and Film, Connector, etc.
(material name, flame retardancy grade, insulation type, temperature)
- Precautions
-
- Confirmation needed whether the good is subject to safety certification and safety assurance
(in case of safety certification, an factory on-site inspection is required)
- Prior review required before import (unconfirmed part needs to be tested when CB report is not prepared - sample costs, expenses, and lead time can increase)