Electrical Appliances

Electrical Appliances

Work Process
  • Preliminary review of documents and other check-lists before import

    STEP1
  • Advanced Clearance for sample

    STEP2
  • Request for a test to a testing institute

    STEP3
  • Attach Korean label when passed

    STEP4
  • Application for safety certification confirmation or conformity assessment confirmation

    STEP5
  • Import Clearance

    STEP6
Required Documents and Checklist
  • Shipping documents (BL, INVOICE, PL)
  • Information on manufacturing factory and manufacturer
  • Part list
  • A copy of business license
  • Park CB report (CB certi + test report / issued within 3 years)
  • Electrical circuit diagram (Schematic diagram): complete circuit details including power supply
  • Product manual: block diagram and description, user’s guide in KOREAN
  • Insulation material specification:
    enclosure, internal plastic, windings, PCB, Insulation Tape and Film, Connector, etc. (material name, flame retardancy grade, insulation type, temperature)
Precautions
  • Confirmation needed whether the good is subject to safety certification and safety assurance
    (in case of safety certification, an factory on-site inspection is required)
  • Prior review required before import (unconfirmed part needs to be tested when CB report is not prepared - sample costs, expenses, and lead time can increase)